TFS Backup Plan Wizard Tool

With the release of the “September – 2010” TFS 2010 Power Tools, came an addition to the Team Foundation Server Administration Console.  This addition is the Team Foundation Backups Tree item. 
wpid-image_thumb-0001-01-3-01-46.png
The tool is used to create backup plans and to work with it you run through a wizard, just like you would in configuring TFS or any of the extensions it has.
wpid-image_thumb_1-0001-01-3-01-46.png
The areas covered through the tool include:
Backup to a Network Backup Path, retention configuration. Under Advanced Options, the extension to be used for the Full and Transactional backups.
wpid-image_thumb_2-0001-01-3-01-46.png
The capability to include external databases, meaning, include the reporting databases and SharePoint databases as part of the plan. 
[UPDATE: Note the documentation on Brian Harry’s Blog on this.  There is a bug that will render your SharePoint in an unsupported state if using the tool.  In the meantime refer to my other post on SharePoint and Windows Server backup]
wpid-image_thumb_3-0001-01-3-01-46.png
There are further options as you can see, that includes being able to define a task scheduler account, be able to set alerts for notifications on execution of the plans, and last the option to configure the schedule for the plan execution.  All in all a very good tool and great way to safeguard the investment you’ve made.

Advertisement
  1. No trackbacks yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.